CFC (Revenue) instruction based on the TNERC order with regard to Rollover of banked units during the lockdown period– reg.

CERC draft notification on Renewable Energy Certification (REC) Regulation 2022 – reg.

Pooled Cost of Power Purchase for the year 2021-22 – reg

Availing Intra State Open Access Power below 1 MW – Case status before TNERC – reg.

Supreme Court direction to TNERC to bring Regulation regarding the “Priority of Adjustment” – reg

Election to the Urban Local Bodies, 2022-Paid Holiday to employees of factories on the day of poll–Instruction from the Labour Department- Reg

TNERC order for collection of “Additional Surcharge” for actual power drawn – reg

GST – Non-compliance (Deposit of GST collected & Filing of Return) by TANGEDCO – Status – Reg.

TANGEDCO petition (MP. No. 01 of 2022) before the TNERC to amend the TNERC (Grid Interactive Solar PV Energy Generating Systems) Regulations, 2021 for extending Net Feed-in methodology to all HT consumers for the establishment of roof top / ground mounted SPV Plants within their premises irrespective of voltage level for all roof top loads of 1 MW and above – reg

Requirement of Solar power under Group Captive Arrangement (50 MW) – Seeking interest of member mills– reg.